Principal Electrical Design Manager for the Client managing an EPCM Engineer in all EI&C detailed design related aspects for full underground mine development at 10mtpa. This included expansion of the existing above ground Power Station with new dedicated UG feeders, then installation of:
- UG primary crushing;
- conveying;
- ongoing dewatering systems;
- emergency dewatering;
- ventilation systems;
- cooling systems;
- leaky feeder; and,
- radio communications
all incorporating the latest Process Control Systems and Network technologies. Interfacing above surface into the existing secondary crushing circuit and subsequent processing and diamond recovery facilities.