Engineering Manager based in Europe, overseeing OEM’s Engineering, Procurement and Assembly in Germany, Sweden and Finland for the detailed development of two (2) Trials Tunnel Boring Machines (6m diameter, 85m length) to be deployed globally for Rapid Development of Underground Mines.
Following the detailed design, assembly and precommissioning phase, Ross was then relocated to site in central NSW Australia, to manage the Engineering aspects of site preparatory planning and installation to effect the site UG trial.
Besides reassembly, and recommissioning on site, it also included designing and installing a Dynamic Data Collection (Rock Mass Geotechnical, and on-board TBM) during the trial phase, and making this available globally for third party technical analysis.